2015
DOI: 10.26634/jps.3.1.3357
|View full text |Cite
|
Sign up to set email alerts
|

Contingency Analysis of A Power System Using PSAT Power System Toolbox

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…The MVA limit for branches 10 and 40 is 48 MVA. The MVA limit for branches12,17,18, 19,24,25,26,27,28 and 41 are 32 MVA. The MVA limit for branches20,21,22,23, 30, 31, 32, 33, 34, 35, 37, 38 and 39 are 16 MVA.…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…The MVA limit for branches 10 and 40 is 48 MVA. The MVA limit for branches12,17,18, 19,24,25,26,27,28 and 41 are 32 MVA. The MVA limit for branches20,21,22,23, 30, 31, 32, 33, 34, 35, 37, 38 and 39 are 16 MVA.…”
mentioning
confidence: 99%
“…In the branch 38 outage, there is a voltage violation at bus 30. In the branch 41 outage, there is a voltage violation at bus 28.Branches 1,2,3,4,11,12,14,15,17,18, 19,20,21,23,28, 31, 32, 33, 39 and 40 have zero performance index in voltage violation as there is no voltage values that exceed the voltage limit.…”
mentioning
confidence: 99%