2008
DOI: 10.1016/j.watres.2007.10.017
|View full text |Cite
|
Sign up to set email alerts
|

Controlling sludge settleability in the oxidation ditch process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

3
9
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(12 citation statements)
references
References 6 publications
3
9
0
Order By: Relevance
“…Data from the Coolum oxidation ditch BNR plant (Figure 4.8) are consistent with this model (Hartley, 2008). The ditch was preceded by an anaerobic reactor (process mass fraction 0.10) for biological phosphorus removal.…”
Section: Influent Rbcodsupporting
confidence: 68%
See 2 more Smart Citations
“…Data from the Coolum oxidation ditch BNR plant (Figure 4.8) are consistent with this model (Hartley, 2008). The ditch was preceded by an anaerobic reactor (process mass fraction 0.10) for biological phosphorus removal.…”
Section: Influent Rbcodsupporting
confidence: 68%
“…He found that SSVI was a minimum at an optimum ammonia:nitrate ratio and increased at higher and lower ratios, as shown in Figure 4.8. (Hartley, 2008). (Hartley, 2008).…”
Section: Anoxic Fractionmentioning
confidence: 99%
See 1 more Smart Citation
“…To take into account the effect of bulking on the settling parameters, the model suggested by Hartley (2008) is used ( Fig. 3):…”
Section: Secondary Clarifiermentioning
confidence: 99%
“…In the investigation conducted by Hartley [16], the author described the design and implementation of a process for settling the sludge deposits. By using a single-phase model, Gancarski [17] studied the settling of sludge on the basis of tracking the particles.…”
Section: Introductionmentioning
confidence: 99%