2022
DOI: 10.1016/j.epsr.2022.108037
|View full text |Cite
|
Sign up to set email alerts
|

Coordinated control of Incentive-Based Demand Response Program and BESS for frequency regulation in low inertia isolated grid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(4 citation statements)
references
References 39 publications
0
4
0
Order By: Relevance
“…The load frequency controller (LFC) is employed with the conventional synchronous generator to support grid frequency. However, in case of excessive renewable energy integration, auxiliary devices, such as the battery, supercapacitor, and superconducting magnetic energy storage devices, are employed to support grid frequency [47][48][49]. The monitoring and control center measures several necessary system parameters and generates control signals for the protection devices and controllers.…”
Section: Solar Pv and Wind Integrated Systemmentioning
confidence: 99%
“…The load frequency controller (LFC) is employed with the conventional synchronous generator to support grid frequency. However, in case of excessive renewable energy integration, auxiliary devices, such as the battery, supercapacitor, and superconducting magnetic energy storage devices, are employed to support grid frequency [47][48][49]. The monitoring and control center measures several necessary system parameters and generates control signals for the protection devices and controllers.…”
Section: Solar Pv and Wind Integrated Systemmentioning
confidence: 99%
“…Technic (Power Quality) Very Short (ms) [36], [37], [38] Peak load and generation mitigation Technic (Power Quality) Very Short (ms) [39], [40] Primary Frequency Control Technic (Power Quality) Very Short -Short (ms-s) [41], [27], [42] Virtual Inertia Technic (Power Quality) Short (s) [43], [44], [45 Technic /Economic Long (hrs.) [53], [22], [20]…”
Section: Harmonic Mitigationmentioning
confidence: 99%
“…If the agent is to search for the prey, then the position of the agent is updated calculating the distance to another agent selected randomly, as in (53). The new position is described in (54).…”
Section: Whale Optimization Algorithmmentioning
confidence: 99%
“…Following PBDRs, the electricity's price is dynamically determined as a function of several parameters, such as the Time Of Use (TOU) and load profile. Then, customers adjust their consumption with respect to the prevailing electricity price [12,13]. However, pursuing IBDRs, the utility requests the customers to reduce or increase their consumption to a certain amount and provides compensation for the consumers' cooperation by introducing incentives.…”
Section: Introductionmentioning
confidence: 99%