2022 International Congress on Human-Computer Interaction, Optimization and Robotic Applications (HORA) 2022
DOI: 10.1109/hora55278.2022.9799830
|View full text |Cite
|
Sign up to set email alerts
|

Cost-related industrial project design using simulation, layout design and an ERP system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…The engineering calculations, analyses, modeling and design documentation became streamlined and accelerated [5]. Presently, there is pressure to design projects and use elements and project management methodologies which would enable planning and management of all processes and stages related to launching new products on the market and significantly reduce the duration of TPP stages [6], [7]. Customer requirements of reducing development stages, minimizing costs, and increasing product quality put pressure on shortening the product innovation cycle [8], [9].…”
Section: Introductionmentioning
confidence: 99%
“…The engineering calculations, analyses, modeling and design documentation became streamlined and accelerated [5]. Presently, there is pressure to design projects and use elements and project management methodologies which would enable planning and management of all processes and stages related to launching new products on the market and significantly reduce the duration of TPP stages [6], [7]. Customer requirements of reducing development stages, minimizing costs, and increasing product quality put pressure on shortening the product innovation cycle [8], [9].…”
Section: Introductionmentioning
confidence: 99%