“…Both chains, receiving and delivering CO2 under the same conditions, include conditioning before export, and the export system itself. In order to gain more insight in the transport technologies, simulations were carried out under Aspen HYSYS ® for the conditionings, while the export system designs were performed on the basis of correlations from the literature (American Petroleum Institute, 1990;European Technology Platform for Zero Emission Fossil Fuel Power Plants (ZEP), 2011;McCoy, 2009;Roussanaly et al, 2013b) in order to obtain their consumption of utilities and the characteristics of their components. On the basis of the following assessment methodologies, the modules developed assess the costs and the climate impact of both transport chains for capacities ranging from 2 to 20 MtCO2/y and transport distances from 200 to 2,000 km.…”