2020
DOI: 10.1007/978-3-030-58942-4_28
|View full text |Cite
|
Sign up to set email alerts
|

CP and Hybrid Models for Two-Stage Batching and Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…Then we randomly selected 5 instances from every set of 1024 instances, creating a set of 80 instances which we used throughout our experiments. This set thus consists of 20 instances each with 10 (instances 1-20), 20 (21)(22)(23)(24)(25)(26)(27)(28)(29)(30)(31)(32)(33)(34)(35)(36)(37)(38)(39)(40), 50 (41-60) and 100 jobs (61-80). All benchmark instances turn out to be satisfiable and solvable by the construction heuristic described in Section 8.2.…”
Section: Experimental Evaluation 91 Benchmark Instancesmentioning
confidence: 99%
See 1 more Smart Citation
“…Then we randomly selected 5 instances from every set of 1024 instances, creating a set of 80 instances which we used throughout our experiments. This set thus consists of 20 instances each with 10 (instances 1-20), 20 (21)(22)(23)(24)(25)(26)(27)(28)(29)(30)(31)(32)(33)(34)(35)(36)(37)(38)(39)(40), 50 (41-60) and 100 jobs (61-80). All benchmark instances turn out to be satisfiable and solvable by the construction heuristic described in Section 8.2.…”
Section: Experimental Evaluation 91 Benchmark Instancesmentioning
confidence: 99%
“…Another recent study [31] introduced a batch scheduling problem from the steel industry that includes setup times, release times, as well as due date constraints. Furthermore, a complex two-phase batch scheduling problem from the composites manufacturing industry has been solved with the use of CP and hybrid techniques [26].…”
Section: Introductionmentioning
confidence: 99%
“…In their paper, (Zhao et al 2020) propose a MIP model and a two-stage decomposition approach as solution methods. Recently, (Tang and Beck 2020) further investigated a complex two-phase batch scheduling problem from the composites manufacturing industry which they approach using CP, heuristics, and hybrid techniques. Further NP-hard single machine scheduling problem variants that do not include batching decisions but aim to minimize tardiness and setup time similarly as it is done in artificial teeth manufacturing, have been investigated for example by (Niu et al 2019) and by (de Weerdt, Baart, and He 2020).…”
Section: Introductionmentioning
confidence: 99%