2022
DOI: 10.1016/j.autcon.2022.104612
|View full text |Cite
|
Sign up to set email alerts
|

Critical influencing factors of supply chain management for modular integrated construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 21 publications
(3 citation statements)
references
References 72 publications
0
3
0
Order By: Relevance
“…Numerous scholars have conducted extensive research on PBSCs from diverse perspectives. Arshad et al [33] explored the key influencing factors and their interactive relationships in the modular integrated building supply chain. They identified factors under four themes: dominant factors, symbiotic factors, external factors, and latent factors, emphasizing the need for further investigation into latent factors.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Numerous scholars have conducted extensive research on PBSCs from diverse perspectives. Arshad et al [33] explored the key influencing factors and their interactive relationships in the modular integrated building supply chain. They identified factors under four themes: dominant factors, symbiotic factors, external factors, and latent factors, emphasizing the need for further investigation into latent factors.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Scholars from around the world have identified and addressed the challenges associated with PC, endeavoring to enhance its implementation in the AEC industry. Their collective efforts have focused on resolving a wide range of challenges, including health and safety problems [12,[14][15][16][17][18][19][20][21][22]; supply chain and supply chain resilience problems [5,[23][24][25][26][27][28][29][30][31]; logistical problems [32,33]; schedule and delay problems [34][35][36][37][38][39]; information technology problems [40]; modular elements' tolerance problems [41,42]; problems related with crane operations [43]; problems related with policy drivers [30]; design problems [44,45]; quality problems [46]; and investment and cost problems [10,[47][48][49][50][51][52].…”
Section: Existing Studies On Pcmentioning
confidence: 99%
“…Prior research on MiC supply chain management has examined mathematical models for logistics configuration design and optimization under operational uncertainty (Hsu et al., 2019), as well as the influence of accidental variables, such as customization, innovativeness, company, and product size, on product modularization and supply chain integration (Pero et al., 2015). Arshad and Zayed (2022) explored the critical influencing factors of MiC supply chain operations, studied their interrelationships, and showed that most of the assembling‐related factors dominate and dynamically control the MiC supply chain performance. Hussein et al.…”
Section: Literature Reviewmentioning
confidence: 99%