2012
DOI: 10.5516/net.03.2012.704
|View full text |Cite
|
Sign up to set email alerts
|

Current Issues on Pra Regarding Seismic and Tsunami Events at Multi Units and Sites Based on Lessons Learned From Tohoku Earthquake/Tsunami

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
13
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 22 publications
(14 citation statements)
references
References 2 publications
0
13
0
Order By: Relevance
“…2. The Emergency Diesel Generators and switchboards installed in the basement floor of the reactor and the turbine buildings were flooded except for Unit 6, and the emergency power source supply was lost (Japanese Government, 2011;Ebisawa et al, 2012c;Kameda, 2012).…”
Section: Overview Of Fukushima Npp Accident and Lessons Learned Frommentioning
confidence: 99%
See 4 more Smart Citations
“…2. The Emergency Diesel Generators and switchboards installed in the basement floor of the reactor and the turbine buildings were flooded except for Unit 6, and the emergency power source supply was lost (Japanese Government, 2011;Ebisawa et al, 2012c;Kameda, 2012).…”
Section: Overview Of Fukushima Npp Accident and Lessons Learned Frommentioning
confidence: 99%
“…Failure of reactor core cooling resulted in core damage in about 5 or 6 h. Temperature and pressure in the primary containment vessel rose up, and radioactive materials were released through seals into the power plant and then the surrounding area. Consequently, a wide area was contaminated by the radioactive materials (Japanese Government, 2011;Ebisawa et al, 2012c;Kameda, 2012).…”
Section: Overview Of Fukushima Npp Accident and Lessons Learned Frommentioning
confidence: 99%
See 3 more Smart Citations