2021
DOI: 10.1007/s11269-021-02798-3
|View full text |Cite
|
Sign up to set email alerts
|

Dam Hydrological Risk and the Design Flood Under Non-stationary Conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

1
0
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 29 publications
1
0
0
1
Order By: Relevance
“…The results of the other two water sources with decreased trends are also supported by previous studies (Chen et al, 2007;. In short, before conducting a hydrological frequency analysis, the non-stationarity of the runoff series must be considered in the planning and construction of water infrastructures including interbasin water transfer projects, reservoirs, and groundwater projects (Dong and Zhang, 2014;Isensee et al, 2021).…”
Section: Trend and Change Points Analysissupporting
confidence: 74%
“…The results of the other two water sources with decreased trends are also supported by previous studies (Chen et al, 2007;. In short, before conducting a hydrological frequency analysis, the non-stationarity of the runoff series must be considered in the planning and construction of water infrastructures including interbasin water transfer projects, reservoirs, and groundwater projects (Dong and Zhang, 2014;Isensee et al, 2021).…”
Section: Trend and Change Points Analysissupporting
confidence: 74%
“…A vazão de projeto de barragens pode ser estimada utilizando distribuições probabilísticas em series temporais de valores máximos anuais (Isensee et al, 2021). Essa vazão pode ser determinada através da estimativa da probabilidade de ocorrência ou recorrência de eventos extremos (Santos et al, 2014), por meio da fixação de um tempo de retorno (TR) (Cassalho et al, 2017).…”
unclassified