2019
DOI: 10.30564/jgr.v1i1.392
|View full text |Cite
|
Sign up to set email alerts
|

Delineation of Cavity in Downstream Surge Chamber at Punatsangchhu-II Hydroelectric Project, Bhutan

Abstract: On 3rd March, 2016, there occurred a massive roof fall incidence in one of the major caverns of Punatsangchhu-II Hydroelectric Project (PHEP-II), Bhutan which halted the operations in the major caverns and required additional strengthening measures. Prior to concluding anything on the treatment measures for the muck flown into the cavern and the cavity formed over the crown of Downstream Surge Chamber, there was a strong need to determine the extents of cavity. Even to understand the influence of cavity format… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…A typical longitudinal section along the dam axis, maximum sluice section and the maximum non-overflowing section showing the location of different instruments at are shown in Figures 5,6…”
Section: Dam Instrumentationmentioning
confidence: 99%
“…A typical longitudinal section along the dam axis, maximum sluice section and the maximum non-overflowing section showing the location of different instruments at are shown in Figures 5,6…”
Section: Dam Instrumentationmentioning
confidence: 99%