Design and development of 500m long HTS cable system in the KEPCO power grid, Korea

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
6
3
1

Relationship

1
9

Authors

Journals

citations
Cited by 26 publications
(12 citation statements)
references
References 4 publications
0
8
0
Order By: Relevance
“…This project is in progress as a government-sponsored research program to develop the HTS cable and operate it in the power grid as earlier reported elsewhere [4]. KEPCO and LSC are jointly participating in this project.…”
Section: Project Descriptionmentioning
confidence: 98%
“…This project is in progress as a government-sponsored research program to develop the HTS cable and operate it in the power grid as earlier reported elsewhere [4]. KEPCO and LSC are jointly participating in this project.…”
Section: Project Descriptionmentioning
confidence: 98%
“…Compared with inclined substrate deposition and ionbeam-assisted deposition approaches [21][22][23][24], the NiW-RABiTS approach is used in this work, due to its superiority in the preparation of double-sided tape and its simplicity of using low-cost sol-gel process for film deposition [25][26][27][28]. The detailed analyses of gradient La 2−x Gd x Zr 2 O 7 buffer architecture and YBCO films on NiW substrate are presented.…”
Section: Introductionmentioning
confidence: 99%
“…Encouraged at the result of DAPAS project, a new project, GENI (Green superconducting Electric power Network at the Icheon substation) project was launched in 2008. In this project, LSC developed a 22.9 kV, 50 MVA, 500 m HTS cable system using 2G HTS wire [6,7]. This HTS cable system has been working at the Icheon substation in the live Korean grid since August, 2011.…”
Section: Introductionmentioning
confidence: 99%