Design and Performance Analysis of 250 kW Grid-Connected Photovoltaic System in Iraqi Environment Using PVsyst Software

Abstract: A 250 kW grid-connected photovoltaic (PV) plant systems have been installed at the Ministry of Electricity in Baghdad and penetrated to the Iraqi national grid since November 2017. This is the first high power grid-connected PV system that has been installed in Iraq and it's one of the four parts 1MW largescale PV systems that should be completed in early of 2019. This paper presents the design and performance analysis of this system using a PVsyst software package. The performance ratio and different losses t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…The 2 nd variant has the biggest initial investment cost, while on the other hand, the 3 rd variant has the smallest investment cost. The value of energy used for loads and energy sold to National Electricity Company is also obtained with PVSyst software simulation [34]. The selling price of electricity for S2 social customers with a power capacity of 105 kVA is $0.05724/kWh.…”
Section: Economic Feasibilitymentioning
confidence: 99%
“…The 2 nd variant has the biggest initial investment cost, while on the other hand, the 3 rd variant has the smallest investment cost. The value of energy used for loads and energy sold to National Electricity Company is also obtained with PVSyst software simulation [34]. The selling price of electricity for S2 social customers with a power capacity of 105 kVA is $0.05724/kWh.…”
Section: Economic Feasibilitymentioning
confidence: 99%