2010 9th International Conference on Environment and Electrical Engineering 2010
DOI: 10.1109/eeeic.2010.5490433
|View full text |Cite
|
Sign up to set email alerts
|

Design of a PV/wind hybrid system for telecommunication load in Borneo region

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2016
2016

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…In this case, the power requirements for the GSM load are about 2kW continuous, and the proposed hybrid system consists of two 7.5kW horizontal-axes type wind turbines, a 5kW Photovoltaic array, a 1kW diesel generator, 1.83kWh battery bank and 2kVA Inverter. Paper [5] proposes a photovoltaic/wind based hybrid power system connected to a common bus with battery storage and conventional backup source to supply a 2kW telecommunication load in Malaysia. The hybrid system consists of 4.5kW PV system, 2kW wind system, and 5kWh battery.…”
Section: Case Studies On Small-scale Hybrid Generation Systemsmentioning
confidence: 99%
“…In this case, the power requirements for the GSM load are about 2kW continuous, and the proposed hybrid system consists of two 7.5kW horizontal-axes type wind turbines, a 5kW Photovoltaic array, a 1kW diesel generator, 1.83kWh battery bank and 2kVA Inverter. Paper [5] proposes a photovoltaic/wind based hybrid power system connected to a common bus with battery storage and conventional backup source to supply a 2kW telecommunication load in Malaysia. The hybrid system consists of 4.5kW PV system, 2kW wind system, and 5kWh battery.…”
Section: Case Studies On Small-scale Hybrid Generation Systemsmentioning
confidence: 99%