2016
DOI: 10.31963/intek.v3i2.52
|View full text |Cite
|
Sign up to set email alerts
|

Determining Interval Time of Maintenance in Bosowa Cement Indonesia using Reliability Method

Abstract: Abstract-Maintenance for machining and production facility is an important aspect to ensure a smooth production process. During this time, it was performed regular maintenance based on technical advice from supplier's engines which just shows things in general without considering the actual operating conditions. This paper aims to plan the maintenance strategies for the Finish Mill unit based on reliability analysis by considering the target system reliability and cost of improving reliability. The data distri… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 8 publications
0
0
0
1
Order By: Relevance
“…Jika sebuah peralatan tersebut mengalami kerusakan maka akan menghambat proses produksi tenaga listrik. Untuk itu diperlukan perawatan secara berkala dan terus menerus agar dapat mengindari kerusakan yang ditimbulkan akibat proses produksi yang dilakukan terus menerus [4] [5].…”
Section: Pendahuluanunclassified
“…Jika sebuah peralatan tersebut mengalami kerusakan maka akan menghambat proses produksi tenaga listrik. Untuk itu diperlukan perawatan secara berkala dan terus menerus agar dapat mengindari kerusakan yang ditimbulkan akibat proses produksi yang dilakukan terus menerus [4] [5].…”
Section: Pendahuluanunclassified