2007
DOI: 10.1016/j.ejor.2006.05.005
|View full text |Cite
|
Sign up to set email alerts
|

Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
60
0
2

Year Published

2009
2009
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 109 publications
(62 citation statements)
references
References 17 publications
0
60
0
2
Order By: Relevance
“…Lin and Gong (2006) developed EPQ model deteriorating inventory model with machine breakdown and fix repair time. Chiu et al (2007) derived an economic production quantity (EPQ) model with scrap, rework, and stochastic machine breakdowns, assuming some portion of the defective items to be scrapped and the other part to be repairable. Leung (2007) derived a generalized geometric programming solution to an EPQ model with flexibility and reliability considerations.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Lin and Gong (2006) developed EPQ model deteriorating inventory model with machine breakdown and fix repair time. Chiu et al (2007) derived an economic production quantity (EPQ) model with scrap, rework, and stochastic machine breakdowns, assuming some portion of the defective items to be scrapped and the other part to be repairable. Leung (2007) derived a generalized geometric programming solution to an EPQ model with flexibility and reliability considerations.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Rework is common in Semiconductor, Pharmaceutical, Chemical, Food industries, Textile industries, Paper industries, Glass industries, Metal processing industries and Plastic industries. Barketau et al (2008); Buscher et al (2007); Chiu et al (2007). Ca´rdenas-Barro´ n, L.E., (2008) presented rework with single stage of production system.…”
Section: Introductionmentioning
confidence: 99%
“…According to this policy, a refill order of amount Q is placed every time the available inventory level falls to r, or when T amounts of time have passed since the last occasion the inventory position reaches Q, whichever happens first. Chiu and Wang (2007) developed an EPQ model with the consideration of scrap, rework and stochastic machine breakdowns. They assumed random breakdown of machine and no resumption (NR) policy in their proposed model.…”
Section: Introductionmentioning
confidence: 99%