“…The NPC of the base case system is $1,141,292 while the COE is $0.3247. With the FIGURE 16 The NPC of each architecture system operated in the hybrid mode at 1 ton of biomass, the NPC and COE of the hybrid system is $911,378 and $0.2593, respectively; $641,096 and $0.1824, at 2 tons of biomass, respectively; $374,742 and $0.1066 respectively, at 3 tons, and $176,600 and $0.052, respectively, at both 4 tons and 5 tons of biomass. However, the NPC and COE of biogas system are $176,085 and $0.0484, respectively.…”