1997
DOI: 10.1016/s0926-5805(97)00005-8
|View full text |Cite
|
Sign up to set email alerts
|

Development of automated weather-unaffected building construction system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2009
2009
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Table 1 lists some of the ACSs and the monitoring systems adopted in them. The components of the monitoring system involve sensors, cameras, barcodes, control room, laser, RFID and software for data collection and analysis (Sekiguchi et al, 1997;Tanijiri et al, 1997;Yamazaki and Maeda, 1998;Wakisaka et al, 2000;Ikeda and Harada, 2006). Some current ACSs lack real-time monitoring systems (Gassel;Bock and Linner, 2016b).…”
Section: Monitoring In Automated Construction Systemsmentioning
confidence: 99%
“…Table 1 lists some of the ACSs and the monitoring systems adopted in them. The components of the monitoring system involve sensors, cameras, barcodes, control room, laser, RFID and software for data collection and analysis (Sekiguchi et al, 1997;Tanijiri et al, 1997;Yamazaki and Maeda, 1998;Wakisaka et al, 2000;Ikeda and Harada, 2006). Some current ACSs lack real-time monitoring systems (Gassel;Bock and Linner, 2016b).…”
Section: Monitoring In Automated Construction Systemsmentioning
confidence: 99%
“…The Japanese construction industry has introduced fully automated construction systems (SMART, ABCS, Big Canopy, etc.) based on the concept of factory automation from the manufacturing industry (Tanijiri et al 1997;Yamazaki and Maeda 1998;Ueno 1998). In hard robotics, the focus has been moved to remote-controlled or autonomous vehicles for safe construction and maintenance work in dangerous environments, and into wearable mechanical devices to augment the capabilities of the worker (Delgado et al 2019).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Extremely bad weather that could disrupt the execution is referred to be anticipated weather or infrastructure misuse unless precautionary measures are implemented. The most common application of weather forecasting is during the construction of unique projects such as long, exposed bridges or high-rise structures(20) (21). Because these projects sometimes have substantial resources, technologies for assessing how and when on-site weather can cause planned activities to shift are more likely.…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%