“…For the operation and maintenance stage, Table 5 shows that the bridge management personnel developed BMS [12,[14][15][16][17]36,44,45,51,52,73,77,78,[84][85][86] based on BIM/GIS technology to facilitate bridge inspection/monitoring [14,34,[37][38][39][40]43,44,[47][48][49][50][51][77][78][79][80][81], bridge evaluation [12,14,16,34,37,38,[41][42][43][44][45][48][49][50]52,…”