2018
DOI: 10.3390/en11061407
|View full text |Cite
|
Sign up to set email alerts
|

Development of Reclosing Method in a Distribution System with Distributed Generation and Battery Energy Storage System

Abstract: The connection of distributed generation (DG) and a battery energy storage system (BESS) in distribution systems has recently been increasing. However, little research has been conducted on the reclosing of the distribution system when both the DG and BESS are connected. Therefore, this paper proposes a new reclosing method for a distribution system with a DG and BESS. The proposed method also has a circuit breaker (CB) installed in the distribution line. A CB close to the DG and BESS is first reclosed after a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 36 publications
0
3
0
Order By: Relevance
“…© 2020 The Authors. IET Generation, Transmission & Distribution published by John Wiley & Sons Ltd on behalf of The Institution of Engineering and Technology not available [4]. The use of an adaptive reclosing scheme provides adaptive dead time by sensing the exact instant of fault clearance [5][6][7].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…© 2020 The Authors. IET Generation, Transmission & Distribution published by John Wiley & Sons Ltd on behalf of The Institution of Engineering and Technology not available [4]. The use of an adaptive reclosing scheme provides adaptive dead time by sensing the exact instant of fault clearance [5][6][7].…”
Section: Introductionmentioning
confidence: 99%
“…During this dead time, BESS often gets unnecessarily engaged even if fault gets cleared. It also causes increased outages in the other non-critical loads or sections where a backup system is not available [4]. The use of an adaptive reclosing scheme provides adaptive dead time by sensing the exact instant of fault clearance [5][6][7].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, this paper establishes the simulation process of transformer inrush current using EMTP, which simulates transient electromagnetic phenomena and is one of the most widely used electric utilities programs. Alternative Transients Program Draw (ATPDraw) is a graphical, mouse-driven pre-processor to the ATP version of EMTP [18][19][20]. Based on the established simulation process, the simulation example of transformer inrush current is presented using 154 kV transformer test data in Korea.…”
Section: Introductionmentioning
confidence: 99%