Digest of Technical Papers. PPC-2003. 14th IEEE International Pulsed Power Conference (IEEE Cat. No.03CH37472)
DOI: 10.1109/ppc.2003.1277949
|View full text |Cite
|
Sign up to set email alerts
|

Development/tests of 6-MV triggered gas switches at SNL

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 20 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…This indicates that the single-channeling trigger gap must be the focus to improving switching performance for both inductance and resistance. Hybrid trigger schemes have been utilized to address the large inductance of a single-channeling gap, but the designs tested to date have provided no conclusive solution [3].…”
Section: Measured Impedance For All Datamentioning
confidence: 99%
“…This indicates that the single-channeling trigger gap must be the focus to improving switching performance for both inductance and resistance. Hybrid trigger schemes have been utilized to address the large inductance of a single-channeling gap, but the designs tested to date have provided no conclusive solution [3].…”
Section: Measured Impedance For All Datamentioning
confidence: 99%
“…The LTGS was tested in the Advanced Pulsed Power Research Module (APPRM). APPRM was originally constructed as a test bed for the development of pulsed power technologies and components that could be used in future generation high power facilities [8]. The test bed is comprised of a 56 stage, 2.2F 100 kV Marx generator that charges a 5.5 Ω 20 nF water insulated Intermediate Storage Capacitor (ISC) to more than 7 MV in ~1.5 s [8].…”
Section: Expermental Equipmentmentioning
confidence: 99%
“…APPRM was originally constructed as a test bed for the development of pulsed power technologies and components that could be used in future generation high power facilities [8]. The test bed is comprised of a 56 stage, 2.2F 100 kV Marx generator that charges a 5.5 Ω 20 nF water insulated Intermediate Storage Capacitor (ISC) to more than 7 MV in ~1.5 s [8]. The switch is located at the output end of the ISC where it is connected to 5.5 Ω CuSO 4 resistive load [8].…”
Section: Expermental Equipmentmentioning
confidence: 99%
See 1 more Smart Citation
“…There are different requirements for pulsed switches in high-power pulsed equipment [1]- [4]. In general, low jitter is one of the most important desired characteristics.…”
Section: Introductionmentioning
confidence: 99%