2022
DOI: 10.3390/app12104820
|View full text |Cite
|
Sign up to set email alerts
|

Double-Cycling AGV Scheduling Considering Uncertain Crane Operational Time at Container Terminals

Abstract: Container terminals (CTs) play an important role in the modern logistics and transportation industry. The utilization of automated guided vehicles (AGVs) can be effectively facilitated by reducing their empty running. The existing strategies cannot guarantee the full load of AGVs during their transportation because of the complex constraints of container scheduling. This work proposes a double-cycling AGV scheduling model that ensures a full load of AGVs between the quayside and the yard. The objective is to m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 45 publications
0
1
0
Order By: Relevance
“…To solve the conflict problem of AGVs, Shi et al 15 proposed a multi-objective scheduling model based on total driving distance and waiting time, and used the A* path planning algorithm to search the shortest path of AGVs. Zhang et al 16 proposed a double-cycling AGV scheduling model, which can guarantee the full load of AGVs during their transportation. A summary of research on AGV scheduling is presented in Table 1 There have been several researches on the AGV scheduling based on a single evaluation standard or multi objective comprehensive evaluation criteria.…”
Section: Agvs Schedulingmentioning
confidence: 99%
“…To solve the conflict problem of AGVs, Shi et al 15 proposed a multi-objective scheduling model based on total driving distance and waiting time, and used the A* path planning algorithm to search the shortest path of AGVs. Zhang et al 16 proposed a double-cycling AGV scheduling model, which can guarantee the full load of AGVs during their transportation. A summary of research on AGV scheduling is presented in Table 1 There have been several researches on the AGV scheduling based on a single evaluation standard or multi objective comprehensive evaluation criteria.…”
Section: Agvs Schedulingmentioning
confidence: 99%