2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference 2008
DOI: 10.1109/asmc.2008.4529045
|View full text |Cite
|
Sign up to set email alerts
|

Effect of Reduced Equipment Downtime Variability on Cycle Time in a Conventional 300mm Fab

Abstract: The semiconductor industry is pursuing further cycle time and cost reductions through an initiative termed 300mm Prime. One key area of focus is improving process tool availability. Equipment downtime−particularly unscheduled down time due to a failure−causes disruptions to production, loss of productivity, and higher costs. This paper focuses on fab productivity improvements resulting from the reduction of tool downtime variability. Preventive maintenance can reduce the risk of unscheduled downtime. Discrete-… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2010
2010

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…In fact, it has been used for electronic prognostics and accelerated degradation analysis [21]- [23]. The model is represented as S(t) Nf(t); 2 (t)g: (5) Notice that S(t) is the signal magnitude at t, it could be voltage, current, power, or timing parameters. (t) and (t) represent the mean and the standard deviation for S(t).…”
Section: Modeling Electronics Degradationmentioning
confidence: 99%
See 1 more Smart Citation
“…In fact, it has been used for electronic prognostics and accelerated degradation analysis [21]- [23]. The model is represented as S(t) Nf(t); 2 (t)g: (5) Notice that S(t) is the signal magnitude at t, it could be voltage, current, power, or timing parameters. (t) and (t) represent the mean and the standard deviation for S(t).…”
Section: Modeling Electronics Degradationmentioning
confidence: 99%
“…For instance, Yao et al [3] developed an optimal PM scheduling algorithm to minimize the production cost for semiconductor equipment. In [4] and [5] optimizations are developed to reduce the cycle time in wafer fabrication. In [6] they analyzed the cluster tool performance in term of tool configuration and maintenance policies.…”
Section: Introductionmentioning
confidence: 99%