2012
DOI: 10.2172/1053309
|View full text |Cite
|
Sign up to set email alerts
|

Effective Grid Utilization: A Technical Assessment and Application Guide; April 2011 - September 2012

Abstract: Figure 1. NERC interconnection 3 Trends and Current SituationA long history (detailed in Chapter 1) has brought the U.S. power system to its current set of operating procedures and regulations. Restructuring of the electricity market, mandatory reliability standards, replacing existing generation with renewable resources, and introducing competition have all served to change the way transmission is developed and operated in the United States. When conventional, dispatchable generation resources, such as coal a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
2
2
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…ISO-NE has thirteen installed and three planned FACTS in its territory [30]. Five EPRI-sponsored FACTS devices are currently operating in AEP's territory (Kentucky), BPA (Oregon), CSW (Texas), TVA (Tennessee), and NYPA (New York) [31]. In PJM, Primary Power LCC is developing the Grid Plus project, which involves installation of several FACTS devices.…”
mentioning
confidence: 99%
“…ISO-NE has thirteen installed and three planned FACTS in its territory [30]. Five EPRI-sponsored FACTS devices are currently operating in AEP's territory (Kentucky), BPA (Oregon), CSW (Texas), TVA (Tennessee), and NYPA (New York) [31]. In PJM, Primary Power LCC is developing the Grid Plus project, which involves installation of several FACTS devices.…”
mentioning
confidence: 99%