2013
DOI: 10.1115/1.4025799
|View full text |Cite
|
Sign up to set email alerts
|

Effective Method to Predict Installation of Plunger in a Gas Well

Abstract: Liquid loading is a common problem for most of the mature gas wells. Over years, many methods have been developed to solve this problem. One of the widely used methods is plunger lift, which requires shut-in of the gas well for a period of time. Then, the well is reopened, and it is expected that the natural energy of the well will push the plunger to the surface carrying the liquid with it. Optimization of the plunger lift requires that the well be shut-in for a period of time as short as possible, followed b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
references
References 17 publications
0
0
0
Order By: Relevance