2018
DOI: 10.1088/1757-899x/337/1/012055
|View full text |Cite
|
Sign up to set email alerts
|

Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(15 citation statements)
references
References 9 publications
0
13
0
2
Order By: Relevance
“…When analyzing all texts in all languages (Table 4 in Appendix A), we note that most papers have addressed parameter and performance analysis of the DDMRP method, as shown in Figure 3. A substantial number of works have also presented a comparison between DDMRP and other methods such as Kanban (Miclo, 2016;Al-Ammar, 2018;Miclo, Lauras, Fontanili, Lamothe & Melnyk, 2019), MRP (Jeong-Sook & Seong-Yong, 2014;Ihme & Stratton, 2015;Ihme, 2015;Miclo, 2016;Miclo, Fontanili, Lauras, Lamothe & Milian, 2015;2016a;2016b;Shofa & Widyarto, 2017;Yu-En, 2017;Shofa, Moeis & Restiana, 2018;Kortabarria & Elizburu, 2018;Marin, 2018;Zachariah-George, 2018;Miclo et al, 2019) and Economic Order Quantity (EOQ) (Tounsi, 2018). Some authors only provide an explanation or an illustration of the method (Román-Cuadra, 2017; Bahu et al, 2018;Bahu et al, 2019;Erraoui, Charkaoui & Echchatbi, 2019;Favaretto & Marin, 2018;Garzón Hernández, 2018;Marin, 2018;Meinzel, 2019;Pekarčíková, Trebuňa, Kliment & Trojan, 2019).…”
Section: Sub-component 1-2 Results: the Evolution Of Ddmrp Based On The Publication Languagesmentioning
confidence: 99%
“…When analyzing all texts in all languages (Table 4 in Appendix A), we note that most papers have addressed parameter and performance analysis of the DDMRP method, as shown in Figure 3. A substantial number of works have also presented a comparison between DDMRP and other methods such as Kanban (Miclo, 2016;Al-Ammar, 2018;Miclo, Lauras, Fontanili, Lamothe & Melnyk, 2019), MRP (Jeong-Sook & Seong-Yong, 2014;Ihme & Stratton, 2015;Ihme, 2015;Miclo, 2016;Miclo, Fontanili, Lauras, Lamothe & Milian, 2015;2016a;2016b;Shofa & Widyarto, 2017;Yu-En, 2017;Shofa, Moeis & Restiana, 2018;Kortabarria & Elizburu, 2018;Marin, 2018;Zachariah-George, 2018;Miclo et al, 2019) and Economic Order Quantity (EOQ) (Tounsi, 2018). Some authors only provide an explanation or an illustration of the method (Román-Cuadra, 2017; Bahu et al, 2018;Bahu et al, 2019;Erraoui, Charkaoui & Echchatbi, 2019;Favaretto & Marin, 2018;Garzón Hernández, 2018;Marin, 2018;Meinzel, 2019;Pekarčíková, Trebuňa, Kliment & Trojan, 2019).…”
Section: Sub-component 1-2 Results: the Evolution Of Ddmrp Based On The Publication Languagesmentioning
confidence: 99%
“…Of the 16 documents selected, three articles (Favaretto & Marin, 2018;Smith & Smith, 2013;Trojan et al, 2019) seek to demonstrate the need for new production controls and planning systems meeting the needs of today's changing paradigm. Six of the articles discuss the quantitative benefits of the DDMRP methodology compared to traditional models, such as MRP or MRPII (Ihme & Stratton, 2015;Miclo et al, 2016Miclo et al, , 2019Shofa et al, 2018; Table 2. The variables defined to measure the impacts of the results.…”
Section: Field Work Resultsmentioning
confidence: 99%
“…Because of this, DDMRP is more effective than MRP. (Shofa et al, 2018) Through a simulation of discrete events, the authors compare the MRP model with the DDMRP model in cases of uncertain demand and long maturation periods. DDMRP improves the inventory level from 106,852 pieces per day to 95,284 pieces per day (11% reduction) and makes inventory stable.…”
Section: Research Area Representative Articles Resultsmentioning
confidence: 99%
“…Out of the practitioner world, new academic research strongly supports the contention that DDMRP does represent significant improvement in planning and scheduling logic (MICLO et al 2019;KORTABARRIA et al 2018;SHOFA;MOEIS;RESTIANA, 2018). On the other hand, research shows that DDMRP has a significant role in reducing Work in Process (WIP)…”
Section: Contextmentioning
confidence: 99%
“…Regarding the recent increase in number of researches, almost every DDMRP research JANG, 2013;IHME, 2015;IHME;STRATTON, 2015;MICLO et al, 2015;2019;KORTABARRIA et al 2018;SHOFA;MOEIS;RESTIANA, 2018) are focused on its implementation and the measure of improvements against other MPC systems. Despite current research proving that DDMRP implementation results in a significant improvement over MRP and its variants, there is no study to develop DDMRP theory nor any study on how it relates with other well-established theories in Operations Management.…”
Section: Contextmentioning
confidence: 99%