2012 ASEE Annual Conference &Amp; Exposition Proceedings
DOI: 10.18260/1-2--21264
|View full text |Cite
|
Sign up to set email alerts
|

Effects of Construction Cost and Volume on Construction Time of Educational Projects in Texas

Abstract: Studies indicate that there is a relationship between project cost and construction time for different construction markets. The purpose of this study is to validate the time-cost relationship model developed by Bromilow et al. 1 in context with educational construction projects in Texas. The model was extended to include the magnitude of the projects in terms of gross floor area and project delivery methods to determine whether these variables also have an effect on project duration. Data related to 39 educat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(7 citation statements)
references
References 6 publications
0
7
0
Order By: Relevance
“…They argued that construction cost, when decomposed, consists primarily of labor and material costs; labor cost is a function of time, and material cost of a building is a function of gross floor area. A similar model to Bromilow’s time-cost relationships was advocated by different scholars, for instance, (Chan, 1998) and (Choudhury, 2012), of the form T = L A M , where A is the total gross floor area in m 2 , and L and M correspond to the constants K and B in the time-cost empirical model. Chan (1998) and Choudhury (2012) tested the assumed time-gross floor area model and were found it to be significant but marginally worse than the time-cost model in some cases.…”
Section: Literature Reviewmentioning
confidence: 93%
See 4 more Smart Citations
“…They argued that construction cost, when decomposed, consists primarily of labor and material costs; labor cost is a function of time, and material cost of a building is a function of gross floor area. A similar model to Bromilow’s time-cost relationships was advocated by different scholars, for instance, (Chan, 1998) and (Choudhury, 2012), of the form T = L A M , where A is the total gross floor area in m 2 , and L and M correspond to the constants K and B in the time-cost empirical model. Chan (1998) and Choudhury (2012) tested the assumed time-gross floor area model and were found it to be significant but marginally worse than the time-cost model in some cases.…”
Section: Literature Reviewmentioning
confidence: 93%
“…Accordingly, the study incorporated a total sample size of fifty-six (56) public building projects; thirty-one (31) Educational and twenty-five (25) Office building projects completed during the period from 2007 G.C to 2014 G.C. The sample size consisted in this study considered to be satisfactorily relative to the previous similar studies; (Choudhury et al , 2002) consisted of the data of 35 health sector construction projects, Choudhury and Rajan (2003) 55 residential projects, Car-Pušić and Radujković (2009) 17 multistorey building projects, Le-Hoai and Dai Lee (2009) 34 building projects, Choudhury (2012) 39 educational projects, Chan and Chan (2002) data of 56 residential buildings and (Odabasi, 2009) 7 educational building projects.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations