1998
DOI: 10.1061/(asce)1090-0241(1998)124:3(254)
|View full text |Cite
|
Sign up to set email alerts
|

Effects of Time on Capacity of Pipe Piles in Dense Marine Sand

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

4
53
0
4

Year Published

2009
2009
2018
2018

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 162 publications
(61 citation statements)
references
References 19 publications
4
53
0
4
Order By: Relevance
“…Setup has been postulated to derive predominantly from an increase in shaft resistance (Komurka et al, 2003). According to Chow et al (1998), relaxation is more likely to aŠect base resistance than shaft resistance.…”
Section: Literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…Setup has been postulated to derive predominantly from an increase in shaft resistance (Komurka et al, 2003). According to Chow et al (1998), relaxation is more likely to aŠect base resistance than shaft resistance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Pile setup for a pile installed in sand resulting from an increase of shaft resistance was ascribed to arching mechanisms by Robinsky and Morison (1964) and Chow et al (1998). Arching in the case of axially loaded piles means that load is not transferred along the shaft only through simple shear (Loukidis and Salgado, 2007) Salgado and Prezzi, 2006) can be used for calculating the increases in horizontal stress, provided that the dilation and soil stiŠness can be quantied.…”
Section: Arching Mechanismmentioning
confidence: 99%
See 3 more Smart Citations