2009
DOI: 10.1016/j.eswa.2008.06.014
|View full text |Cite
|
Sign up to set email alerts
|

Efficiency measures of PCB manufacturing firms using relational two-stage data envelopment analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
18
0
1

Year Published

2011
2011
2023
2023

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 40 publications
(19 citation statements)
references
References 16 publications
0
18
0
1
Order By: Relevance
“…Consequently, problems with a large number of possible batching states cannot be solved within a restricted amount of time [19], and therefore, adapting intelligent optimization techniques are preferable. Moreover, there are many applications of intelligent optimization techniques to PCB manufacturing in the literature such as Dong et al [12], Hadavandi et al [14], Liukkonen et al [24], Hsu [16], Liu and Wang [25] and Chang et al [1]. In sequel, we will describe components of suggested simulation-based optimization approach separately.…”
Section: Complexity Of Problemmentioning
confidence: 98%
See 1 more Smart Citation
“…Consequently, problems with a large number of possible batching states cannot be solved within a restricted amount of time [19], and therefore, adapting intelligent optimization techniques are preferable. Moreover, there are many applications of intelligent optimization techniques to PCB manufacturing in the literature such as Dong et al [12], Hadavandi et al [14], Liukkonen et al [24], Hsu [16], Liu and Wang [25] and Chang et al [1]. In sequel, we will describe components of suggested simulation-based optimization approach separately.…”
Section: Complexity Of Problemmentioning
confidence: 98%
“…They then proposed a hybrid genetic algorithm for solving problem within a reasonable computational time. In addition, Luo et al [25] suggested a two-stage hybrid flowshop and proposed a mathematical model and a genetic algorithm to cope with the problem. The makespan of the resulting schedules is much better than that of manual schedules.…”
Section: Intelligent Optimizationmentioning
confidence: 99%
“…Chen, Cook, Li, & Zhu, 2009;Cook, Liang, Yang, & Zhu, 2007, chap. 11;Kao, 2009a;Kao & Hwang, 2008;Liang, Cook, & Zhu, 2008;Liang, Yang, Cook, & Zhu, 2006;Liu & Wang, 2009;Yang, Wu, Liang, Bi, & Wu, in press) and also to parallel processes systems (e.g. Kao, 2009b).…”
Section: Introductionmentioning
confidence: 97%
“…However, the relational two-stage DEA was then suggested to apply to non-life insurance companies in Taiwan [6]. Under the relational two-stage DEA method, the overall efficiency is the product of the efficiencies of the two sub-processes, and the efficiencies calculated from this approach are more meaningful than those calculated from the independent two-stage DEA approach [7].…”
Section: Literature Reviewmentioning
confidence: 99%