2022
DOI: 10.1007/s44196-022-00124-2
|View full text |Cite
|
Sign up to set email alerts
|

Energy-Aware Scheduling of Two-Stage Flexible Flow Shop Based on Group Technology: Consideration of the Inconsistency of Process Differences

Abstract: The diversity of consumer demand makes the manufacturing industry shift from the production mode of small variety and large batch to the production mode of multi-variety and small batch, which leads to the increase of production cost and the decrease of production efficiency, especially the increase of energy consumption. In this paper, the energy-aware scheduling problem of two-stage flexible flow shop based on group technology is studied, in which the process differences of jobs in the two stages are inconsi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 41 publications
0
0
0
Order By: Relevance