Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand

Abstract: PurposeThe purpose of this paper is to provide insights into the environment, resources and surroundings factors to develop a system dynamic model of dynamic project scheduling that aids on-time project delivery by reducing the project delay for the road construction industry in New Zealand (NZ).Design/methodology/approachThis study adopted narrative inquiry methodology that involved semi-structured interviews (SSI)/expert opinion and systematic literature review (SLR) data to determine the environment, resour… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(7 citation statements)
references
References 75 publications
0
7
0
Order By: Relevance
“…The paper in [18] developed a method for analyzing and deducing errors in human posture to mitigate musculoskeletal disorders among construction workers. The study employs www.ijacsa.thesai.org vision-based techniques to monitor and assess the postures of construction workers, aiming to identify and rectify potentially harmful positions.…”
Section: Related Workmentioning
confidence: 99%
“…The paper in [18] developed a method for analyzing and deducing errors in human posture to mitigate musculoskeletal disorders among construction workers. The study employs www.ijacsa.thesai.org vision-based techniques to monitor and assess the postures of construction workers, aiming to identify and rectify potentially harmful positions.…”
Section: Related Workmentioning
confidence: 99%
“…This criterion combines both an environmental and a financial perspective, where companies strive to produce as little waste as possible, both in terms of the amount of individual materials wasted and in the amount of non-recycled packaging material, which is an increasingly significant item in the cost of construction contracts. The impact of construction on its surroundings is often a hotly debated topic [21], both during the actual construction and in the course of the building's use. Construction companies are particularly concerned with measurement during construction.…”
Section: Performance Measurement Systems and Their Measurable Criteriamentioning
confidence: 99%
“…Researchers have sought to identify the variables that cause delays in road projects, and have highlighted some causes and factors that lead to poor cost and time performance in developed and developing countries (Melaku Belay et al, 2021). Most of these studies were performed through an analysis of the literature coupled with questionnaires, as well as with analysis methods such as the Importance Index, Frequency Index, and Severity Index (Mohajeri Borje Ghaleh et al, 2021;Negesa, 2022;Purushothaman & Kumar, 2022;Subedi & Joshi, 2020;Mejía et al, 2020;Rivera, Baguec, & Yeom, 2020).…”
Section: Introductionmentioning
confidence: 99%