Purpose This study aims to highlight the system-wide potential relationships between forms of human bias, selected Lean tools and types of waste in a manufacturing process. Design/methodology/approach A longitudinal single-site ethnographic case study using digital processing to make a material receiving process Lean was adopted. An inherent knowledge process with internal stakeholders in a stimulated situation alongside process requirements was performed to achieve quality data collection. The results of the narrative analysis and process observation, combined with a literature review identified widely used Lean tools, wastes and biases that produced a model for the relationships. Findings The study established the relationships between bias, Lean tools and wastes which enabled 97.6% error reduction, improved on-time accounting and eliminated three working hours per day. These savings resulted in seven employees being redeployed to new areas with delivery time for products reduced by seven days. Research limitations/implications The single site case study with a supporting literature survey underpinning the model would benefit from testing the model in application to different industries and locations. Practical implications Application of the model can identify potential relationships between a group of human biases, 25 Lean tools and 10 types of wastes in Lean manufacturing processes that support decision makers and line managers in productivity improvement. The model can be used to identify potential relationships between forms of human biases, Lean tools and types of wastes in Lean manufacturing processes and take suitable remedial actions. The influence of biases and the model could be used as a basis to counter implementation barriers and reduce system-wide wastes. Originality/value To the best of the authors’ knowledge, this is the first study that connects the cognitive perspectives of Lean business processes with waste production and human biases. As part of the process, a relationship model is derived.
PurposeThe purpose of this paper is to provide insights into the environment, resources and surroundings factors to develop a system dynamic model of dynamic project scheduling that aids on-time project delivery by reducing the project delay for the road construction industry in New Zealand (NZ).Design/methodology/approachThis study adopted narrative inquiry methodology that involved semi-structured interviews (SSI)/expert opinion and systematic literature review (SLR) data to determine the environment, resources and surroundings factors to develop a system dynamic model of dynamic project scheduling that aids on-time project delivery by reducing the project delay for the road construction industry in NZ. The data were analysed by using descriptive analysis, Likert scale and thematic analysis techniques to understand the relationship of these factors to propose a system dynamic model.FindingsThis study concludes that weather, pandemic, material, geotechnical and disaster factors highly influence while other factors such as equipment shortage, breakdown, design error, labour and event had mixed impact on the dynamic scheduling (DS) that aids on-time project delivery. The proposed system dynamic model can enhance the understanding of factors affecting DS.Research limitations/implicationsSLR is limited to English literature. The limitations of an SSI and a small sample size are acknowledged.Practical implicationsThe proposed model can reduce the uncertainty and scheduling errors during the planning phase and aid in the lesser scheduling modification during the execution phase. In practice, this study will be helpful for road contractors to understand environment, surroundings and resource in-control and out-of-control factors, overcome road construction delays, reduce cost, aid in stakeholder management and sustainable development.Social implicationsThe inclusion of environment, resource and surroundings factors in force majeure clauses will bring an understanding between contracting parties and in turn reduce disputes and delays and help social causes such as on-time infrastructure delivery.Originality/valueFor the first time in a road construction, dynamic project scheduling model that collectively included and linked environment, resource, and surroundings factors to determine the in-control and out-of-control factors for an organisation is proposed. The novelty in the paper is provided by the inclusion of the events, disasters, and pandemics influence on DS in the NZ road construction industry for the first time.
PurposeThis review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity to construction phases, namely men, materials, machines, methods and measurement (5M) and impacting factors.Design/methodology/approachThis study used an SLR approach and examined articles published since the 2000s to explore the connectivity of system-wide waste to construction phases, 5M and impacting factors. The results are given in table forms and a causal loop diagram.FindingsResults show that the construction and demolition (CD) waste research carried out from various perspectives is standalone. The review identified ten types of system-wide waste with strong interlinks in the construction industry. The finding highlights connectivity between wastes other than material, labour and time and the wastes' impacting factors. Further, the review results highlighted the solid connectivity for construction phases, 5M, and impacting factors such as productivity (P), delay (D), accidents (A), resource utilisation (R) and cost(C).Research limitations/implicationsSLR methodology limitations include not keeping in phase with the most updated field knowledge. This limitation is offset by choosing the range for literature review within the last two decades. This literature review may not have captured all published articles because the restriction of database access and search was based only on English. Also, fruitful articles hiding in less popular journals may not be included in the well-known database that was searched. Researcher bias of the authors and other researchers that authored the articles referred to is a limitation. These limitations are acknowledged.Practical implicationsThis article unravels the construction system-wide waste and the waste's interlinks, which would aid industry understanding and focus on eliminating the waste. The article highlights the connectivity of system-wide wastes to 5M, which would help better understand the causes of the waste. Further, the paper discusses the connectivity of system-wide waste, 5M and P, D, A, R and C that would aid the organisation's overall performance. The practical and theoretical implications include a better understanding of waste types to help capture better data for waste reduction and productivity improvement. The operating managers could use the tracking of wastes to compare estimated and actual resources at every process stage. This article on system-wide waste, 5M and P, D, A, R and C, relationships and their effects can theorize that the construction industry is more likely to identify clear root causes of waste now than previously. The theoretical implications include enhanced understanding for academics on connectivity between waste, 5M and P, D, A, R and C that the academics can use and expand to provide new insights to existing knowledge.Originality/valueFor the first time, this article categorised and highlighted the ten types of waste in construction industries and the industries' connectivity to construction phases, 5M and impacting factors.
Normalization of details is basic to survey the nature of medications for the helpful worth. The World Health Organization (WHO) in 1999, has given a feature convention for the normalization of medications including a solitary substance, however, next to no writing is accessible for the normalization of poly-home grown medications. We have built up a basic plan for the normalization and authentification containing four plant fixings. Three examples from various makes were obtained and exposed to different physicochemical investigations and HPTLC fingerprinting alongside in-house detailing. The set boundaries were seen as adequate to normalize and can be utilized as orientation principles for the excellence control/quality affirmation study. The purgative action of the fluid concentrate was likewise assessed to legitimize the conventional case.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.