2019
DOI: 10.1007/978-3-030-18576-3_9
|View full text |Cite
|
Sign up to set email alerts
|

EPPADS: An Enhanced Phase-Based Performance-Aware Dynamic Scheduler for High Job Execution Performance in Large Scale Clusters

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 13 publications
0
2
0
Order By: Relevance
“…A lot of prior research works have already put a lot of effort in trying to improve the job processing performance in clusters provisioned with heterogeneous nodes [6]- [10], [17]- [20]. This heterogeneity, coupled with fluctuating workload conditions, leads to degraded job processing performance and this can become worse in large scale data processing clusters which handles exabytes of data per day.…”
Section: B Performance-aware Dynamic Schedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…A lot of prior research works have already put a lot of effort in trying to improve the job processing performance in clusters provisioned with heterogeneous nodes [6]- [10], [17]- [20]. This heterogeneity, coupled with fluctuating workload conditions, leads to degraded job processing performance and this can become worse in large scale data processing clusters which handles exabytes of data per day.…”
Section: B Performance-aware Dynamic Schedulingmentioning
confidence: 99%
“…Therefore, effective energy saving approaches needs to be designed to solve the power consumption problems faced in large scale data processing clusters [11]- [16]. Previous works [17], tried to resolve the performance penalty caused by node instrumentation, but it did not resolve the power consumption problem faced in large scale clusters. To address the discussed limitations of the existing approaches, we propose an energy efficient Enhanced Phase-based Performance Aware Dynamic Scheduler (EPPADS).…”
Section: Introductionmentioning
confidence: 99%