2019
DOI: 10.37128/2520-6168-2019-1-5
|View full text |Cite
|
Sign up to set email alerts
|

Equipment for Highly Efficient Treatment of Waste Water at Agricultural Enterprises

Abstract: The paper proposes a highly efficient equipment for the preliminary mechanical treatment of wastewater from agricultural enterprises, ensuring a continuous working process, the necessary quality of cleaning with minimal energy expenditure. The equations for determining the basic operating parameters of the equipment are given: changes in the flow area, flow rates of water passing through the installation, the required power of the electric motors. Also presented are graphical dependencies calculated using the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…This problem is solved in the proposed article. Additionally, the work gives the dependencies for determining the main operational parameters of the installation, on the basis of which a methodology for its design calculation can subsequently be developed [Sevostianov, 2019]. Figure 4 shows the scheme of the installation for preliminary mechanical treatment of wastewater developed by the authors.…”
Section: Journal Of Ecological Engineeringmentioning
confidence: 99%
See 2 more Smart Citations
“…This problem is solved in the proposed article. Additionally, the work gives the dependencies for determining the main operational parameters of the installation, on the basis of which a methodology for its design calculation can subsequently be developed [Sevostianov, 2019]. Figure 4 shows the scheme of the installation for preliminary mechanical treatment of wastewater developed by the authors.…”
Section: Journal Of Ecological Engineeringmentioning
confidence: 99%
“…In order to prevent a significant drop in the pre-treatment performance of the effluent in the proposed installation, the gratings should be cleaned at the time t = 0.5•t 1 . For reception of the graphical dependence of t I , S р.тах must be taken as a part of the cross-sectional area of the pipe -S p , which can be calculated, depending on the diameter D p : The flow rate Q c is determined based on the specified daily volume of wastewater at the enterprise Q Σ = 500 m 3 /day, the duration of shift T ds = 8 h, the coefficient k np that takes into consideration the duration of downtime due to the scheduled maintenance operations (cleaning, lubrication, adjustment, replacement and replenishment of working fluid in the hydraulic system, preventive testing of electrical and electronic parts of equipment, downtime for organizational and technical reasons (absence of worker, foreman, adjuster, work, raw materials, electricity, documentation, etc., as well as the coefficient variability of work k vw = 3 by the formula [Sevostianov 2019…”
Section: Description Of the Installation And Operating Parametersmentioning
confidence: 99%
See 1 more Smart Citation