2011
DOI: 10.1057/jors.2010.107
|View full text |Cite
|
Sign up to set email alerts
|

Equipment selection with heterogeneous fleets for multiple-period schedules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…Unpredictable and subjective factors often interfere with its work: poor rock crushing during drilling and blasting, mismatch between shovels and trucks, different quality of different road sections, impossibility of overtaking slow-moving trucks by more fast ones, varying degrees of truck wear and driver qualification, unpredictable breakdowns, etc. [8][9][10][11][12].…”
Section: Resultsmentioning
confidence: 99%
“…Unpredictable and subjective factors often interfere with its work: poor rock crushing during drilling and blasting, mismatch between shovels and trucks, different quality of different road sections, impossibility of overtaking slow-moving trucks by more fast ones, varying degrees of truck wear and driver qualification, unpredictable breakdowns, etc. [8][9][10][11][12].…”
Section: Resultsmentioning
confidence: 99%
“…, investigated in [8][9][10][11][12] and called "the match factor". Actually, the functional criterion λ (7) is the ratio of the rate of arrival of trucks for loading t  and the rate of service them by shovels s  .…”
Section: Introductionmentioning
confidence: 99%