2016 National Power Systems Conference (NPSC) 2016
DOI: 10.1109/npsc.2016.7858838
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation and improvement of reliability indices of electrical power distribution system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0
3

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 43 publications
(24 citation statements)
references
References 3 publications
0
21
0
3
Order By: Relevance
“…Moreover, the goal of application of new technical standards and modern technologies is to increase energy efficiency. The projects reducing the losses in the transformers are conducted, and special computational algorithms facilitating the process of selection of transformers are developed [4,12,13,22].…”
Section: The Methods and Actions Taken To Improve Power Supply Reliability Indexes In The Distribution Network Of A Selected Department Omentioning
confidence: 99%
“…Moreover, the goal of application of new technical standards and modern technologies is to increase energy efficiency. The projects reducing the losses in the transformers are conducted, and special computational algorithms facilitating the process of selection of transformers are developed [4,12,13,22].…”
Section: The Methods and Actions Taken To Improve Power Supply Reliability Indexes In The Distribution Network Of A Selected Department Omentioning
confidence: 99%
“…Reliability is the ability of a distribution system to provide uninterrupted power supply to customer [25]. Reliability indices are the benchmark parameters for evaluating reliability of the distribution system and performance of the utility.…”
Section: Problem Formulationmentioning
confidence: 99%
“…Although the high-set was configured to trip instantaneously, the actual TT was equivalent to the circuit-breaker operating time since the circuit-breaker was not capable of tripping instantaneously. The circuitbreaker operating time is defined as the time elapsed between the trip initiation and when the arc has been extinguished and is assumed to be 80 ms [25]. For the position and protection settings of reclosers provided in Table 5, the energy exposure for a fault at every 1 km interval of the feeder is plotted in Figure 5 with and without a high-set applied on the feeder circuit-breaker.…”
Section: Variations In Recloser Positioning: Bottom-up Approach and Tmentioning
confidence: 99%
“…Through the proposed strategy, service restoration, self-healing and fault indicator are added to increase the reliability and performance of distribution networks. The impact of the number and the position of reclosers on the investment cost, customer interruption costs and the system average interruption duration index (SAIDI) were also discussed [22][23][24][25][26][27][28][29][30][31]. An increase in the number of reclosers minimises the customer outage costs and improves the network SAIDI [25,26].…”
Section: Introductionmentioning
confidence: 99%