2021
DOI: 10.1088/1742-6596/1825/1/012027
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of hydrogen gas flow system in DECY - 13 cyclotron

Abstract: The Center for Accelerator Science and Technology (CAST – BATAN) is developing a cyclotron that eventually will be used for radioisotope production. The cyclotron accelerates charged particles (?−) generated by ion source through circular trajectories up to the desired energy and form proton beams through an extraction system. In the early operational stage, the beam current strongly influenced by the flow speed of hydrogen gas in the head of an ion source, therefore the gas flow performance needs to be charac… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
2
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 3 publications
0
2
0
2
Order By: Relevance
“…The main components of the DECY-13 cyclotron consist of seven main components and two supporting components. The main components are the ion source system [14], [15], the magnetic system [16], [17], the vacuum system, the radio frequency generator (RF) system, the speeding RF system, the beam measuring system, and the extractor system. Meanwhile, the two supporting components consist of an instrumentation and control system (ICS) [18], as well as a utility system (electricity and cooling).…”
Section: The Current Condition Of Decy-13 Cyclotron Laboratory To Sup...mentioning
confidence: 99%
“…The main components of the DECY-13 cyclotron consist of seven main components and two supporting components. The main components are the ion source system [14], [15], the magnetic system [16], [17], the vacuum system, the radio frequency generator (RF) system, the speeding RF system, the beam measuring system, and the extractor system. Meanwhile, the two supporting components consist of an instrumentation and control system (ICS) [18], as well as a utility system (electricity and cooling).…”
Section: The Current Condition Of Decy-13 Cyclotron Laboratory To Sup...mentioning
confidence: 99%
“…ITAE merupakan penambahan pengali waktu pada IAE, sehingga akan lebih mempercepat respon dalam mereduksi error. Percobaan pertama dilakukan pada saat bejana berada pada kondisi vakum seperti pada eksperimen yang dilakukan pada penelitian sebelumnya [17]. Gas dimasukkan dengan input step dan diamati waktunya (respon waktu) dari nilai 0 sampai mencapai input yang diberikan.…”
Section: Metodologiunclassified
“…Banyaknya aliran gas yang diberikan untuk pembuatan model 3 sccm dengan masingmasing sebanyak 5 kali percobaan dan menghasilkan hasil yang hampir sama. Eksperimen dilakukan pada saat tingkat kevakuman 10 -3 Torr (vakum rendah) dan 10 -5 Torr (vakum tinggi) [17]. Input gas diberikan berupa sinyal step dan output diukur dengan alat ukur aliran gas (mass flow meter) dengan satuan sccm (cm 3 /min).…”
Section: Hasil Dan Pembahasan Identifikasi Sistem Dan Eksperimenunclassified
“…It's essential to mention that the gas flow system has not been physically installed on the cyclotron as of yet. Therefore, subsequent tests will be conducted to evaluate its functionality based on ion source operation with a gas input rate of 5-6 SmL/min [11].…”
Section: Introductionmentioning
confidence: 99%