2013
DOI: 10.1016/j.engstruct.2012.11.027
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of strand bond properties along the transfer length of prestressed lightweight concrete members

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 14 publications
(9 citation statements)
references
References 10 publications
0
9
0
Order By: Relevance
“…Where, P 1 is the initial tension force on the strand which typically taken as 70-75% of the ultimate stress multiplied by the cross section area of the strand [1,9]. P 2 is the force after the stress released from the strand in which the effective force P  on the strand is…”
Section: (C))mentioning
confidence: 99%
See 4 more Smart Citations
“…Where, P 1 is the initial tension force on the strand which typically taken as 70-75% of the ultimate stress multiplied by the cross section area of the strand [1,9]. P 2 is the force after the stress released from the strand in which the effective force P  on the strand is…”
Section: (C))mentioning
confidence: 99%
“…Previous researches [8][9][10] indicated that bond strength between concrete and strand is mainly In the current model the steel strand is modelled using three-node beam element. The material degradation and thermal expansion of the steel strand is considered in the model.…”
Section: Effect Of Elevated Temperaturesmentioning
confidence: 99%
See 3 more Smart Citations