2020
DOI: 10.14710/ijred.9.2.177-187
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of the Wind Potential and Optimal Design of a Wind Farm in The Arzew Industrial Zone in Western Algeria

Abstract: This work presents an assessment of the wind potential and a design methodology for a 10 MW wind farm in the Arzew industrial region, located in northwest Algeria, to improve the quality of service of the electricity grid and increase Algeria's participation in the use of renewable energy. The hourly wind data of 10 years (2005-2015) that correspond to the wind potential of the site were analyzed, such as: dominant wind directions, probability distribution, Weibull parameters, mean wind speed and power potenti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 15 publications
(3 citation statements)
references
References 26 publications
0
3
0
Order By: Relevance
“…where k is the Weibull shape parameter, c is the Weibull scale parameter, ̅ is the average wind speed and is the Gamma function [45], [46]. A different number of bins is depicted in Figure 1 for each histogram (from the smallest to the most significant, according to relationship 1 + 3.3 log ).…”
Section: The Novel Propose Methods -Alternative Graphical Methods (Agm)mentioning
confidence: 99%
“…where k is the Weibull shape parameter, c is the Weibull scale parameter, ̅ is the average wind speed and is the Gamma function [45], [46]. A different number of bins is depicted in Figure 1 for each histogram (from the smallest to the most significant, according to relationship 1 + 3.3 log ).…”
Section: The Novel Propose Methods -Alternative Graphical Methods (Agm)mentioning
confidence: 99%
“…6 depicts its power distribution as a function of speed with 80 m hub height extrapolated using Eq.(1). Our decision was influenced by a comparative study conducted for the Arzew area (Marih et al, 2020).…”
Section: Wind Farm Design and Energy Outputmentioning
confidence: 99%
“…What has been accomplished from wind energy farms until this year 2020 is one farm, in Adrar city with a power of 10 MW (Table 4). Waiting for the remainder of the government's plan to invest in wind energy by installing 5 GW of wind energy out of 22 GW of renewable energy by 2030 [30].…”
Section: A-wind Energy Realizationmentioning
confidence: 99%