2017
DOI: 10.1134/s1062739117011908
|View full text |Cite
|
Sign up to set email alerts
|

Experience in the Adoption of Room & Pillar Mining Method in the Company OKD, a.s., Czech Republic

Abstract: A significant quantity of available hard coal reserves in the area of Upper Silesian Basin in the Czech Republic occurs below the areas where surface mine subsidence is unacceptable or may be only minimal. An effort is made to mine these reserves by means of a new, mining method yet not approved for the joint-stock company OKD, a.s., namely a special modification of the continuous mining method Room & Pillar. The main objective is to eliminate the mentioned surface restraints by leaving stable pillars of coal … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…They are meant to ensure the stability of the post-excavation area (the field or its part). For new fields of exploitations, in which the room and pillar method will be used, monitoring systems of the rock bolt support are designed to optimize the bolting technological parameters [20]. Room and pillar mining methods are dedicated to horizontally or slightly inclined orebodies.…”
Section: Room and Pillar Methods In Hard Rock Miningmentioning
confidence: 99%
“…They are meant to ensure the stability of the post-excavation area (the field or its part). For new fields of exploitations, in which the room and pillar method will be used, monitoring systems of the rock bolt support are designed to optimize the bolting technological parameters [20]. Room and pillar mining methods are dedicated to horizontally or slightly inclined orebodies.…”
Section: Room and Pillar Methods In Hard Rock Miningmentioning
confidence: 99%
“…With the growth of global energy demand, coal, as an important source of energy, has seen an increase in both consumption and production [1,2]. However, due to the increasing scarcity of coal resources, coal mines around the world are facing mining difficulties, and mining has caused varying degrees of environmental damage [3][4][5][6].…”
Section: Introductionmentioning
confidence: 99%
“…In this method, the overlying rock mass support is ensured by rib pillars within the project-specified period of time. This is achieved through the optimization of the room-and-pillar dimensions (width of rooms and pillars, mining height) in compliance with the effective standards and procedure [5][6][7], or based on specific research [8][9][10][11]. On the other hand, it is quite often the design parameters fail to ensure the target life of the load-bearing elements in the structure of a room-and-pillar mine.…”
Section: Introductionmentioning
confidence: 99%