Experiment data report for semiscale Mod-1 test S-04-1 (baseline ECC test). [PWR]

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1977
1977
1977
1977

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Each _test investigated a particular concept which utilized different combinations of F.CC injection locations and rates. Each of the tests, utilizing an alternate ECC injection concept, was set up with essentially the same prerupture conditions as in an appropriate cold leg injection baseline test (either Test S-04-6 of Test Series 4 [3] or Test S-05-6 of the present test group). T)le transient core power control was also maintained constant among the alternate ECC injection tests and the baseline tests, and is shown in Figure 12.…”
Section: • Semiscale Mod-1 Corementioning
confidence: 99%
“…Each _test investigated a particular concept which utilized different combinations of F.CC injection locations and rates. Each of the tests, utilizing an alternate ECC injection concept, was set up with essentially the same prerupture conditions as in an appropriate cold leg injection baseline test (either Test S-04-6 of Test Series 4 [3] or Test S-05-6 of the present test group). T)le transient core power control was also maintained constant among the alternate ECC injection tests and the baseline tests, and is shown in Figure 12.…”
Section: • Semiscale Mod-1 Corementioning
confidence: 99%