2021
DOI: 10.1016/j.eswa.2021.114947
|View full text |Cite
|
Sign up to set email alerts
|

Experimental analysis of tardiness in preemptive single machine scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

2
4

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 34 publications
0
6
0
Order By: Relevance
“…Another term in LMPs is JIT scheduling. In JIT output scheduling, the manufacturer’s main goal is to complete all required jobs as close to their due dates as possible, including assessing indicators, such as total weighted tardiness and total weighted earliness (Goldengorin and Romanuke, 2021). Existing evidence demonstrates that the careful implementation of JIT manufacturing leads to an increase in reliability and production, competitiveness and a reduction in costs and waste (Javadian Kootanaee et al , 2013; Bader et al , 2020).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Another term in LMPs is JIT scheduling. In JIT output scheduling, the manufacturer’s main goal is to complete all required jobs as close to their due dates as possible, including assessing indicators, such as total weighted tardiness and total weighted earliness (Goldengorin and Romanuke, 2021). Existing evidence demonstrates that the careful implementation of JIT manufacturing leads to an increase in reliability and production, competitiveness and a reduction in costs and waste (Javadian Kootanaee et al , 2013; Bader et al , 2020).…”
Section: Literature Reviewmentioning
confidence: 99%
“…huge and small companies, production and service lines, and organizations -educational, medical, governmental and private. For each of these we are able to indicate an input of jobs, their operations including available resources (tools) and an expected output of ordered (sequenced) products (jobs) to be processed Goldengorin, Romanuke [3].…”
Section: ]mentioning
confidence: 99%
“…Fig. 2 shows the optimal loading of empty slots for performing job in the order (1,2,5,3,4,6). The sequence (1, 2, 5, 3, 4, 6) is found by exhaustive brute force search and is a solution to the problem JeSP.…”
Section: A Numerical Examplementioning
confidence: 99%
“…Denominator αi in the decisive ratio for set (3) can be calculated in various ways. The known heuristic involving the remaining processing time and remaining available time [14], [16] suggests the following way:…”
Section: Motivationmentioning
confidence: 99%
“…Heuristic #15 is based on the greedy heuristic suggested in [15]. Heuristics ##18, 19, 21-23 are based on the rules suggested in [14], [16]. Each of the heuristics presented in Tables III and IV can produce the best result, i. e. a TWT less than a TWT by any other heuristic (thus, the best result TWT is a globally minimal TWT).…”
Section: Motivationmentioning
confidence: 99%