2018
DOI: 10.24815/jarsp.v1i4.12466
|View full text |Cite
|
Sign up to set email alerts
|

Faktor-Faktor Risiko Waktu Yang Mempengaruhi Biaya Pelaksanaan Proyek Konstruksi Gedung Di Provinsi Aceh

Abstract: In the implementation of building construction projects in Aceh Province, faced with problems related to delays. The delay in the project has been a major contribution to the swelling of project costs. This study aims to identify the dominant time risk factors that occur during the implementation of building construction projects, as well as to analyze the relationship and influence between time risk factors to the cost of building construction projects in Aceh Province. This study uses qualitative methods thr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 0 publications
0
1
0
2
Order By: Relevance
“…Figures from the results of the analysis are in the form of r count, Cronbach alpha, correlation coefficient, and regression coefficient. In connection with the respondent's perceptions in the form of words, then analyzed to produce numbers, this method is called a quantitative-qualitative approach [4].…”
Section: Methodsmentioning
confidence: 99%
“…Figures from the results of the analysis are in the form of r count, Cronbach alpha, correlation coefficient, and regression coefficient. In connection with the respondent's perceptions in the form of words, then analyzed to produce numbers, this method is called a quantitative-qualitative approach [4].…”
Section: Methodsmentioning
confidence: 99%
“…Jurnal ini dibuat di Indonesia dengan mengettrapkan manajemen risiko frekuensi kecelakaan menjadi nihil (Devi et al, 2018). Jurnal ini dibuat di Indonesia dapat mengetahui faktor risiko yang dominan adalah faktor keuangan (Taufik et al, 2018). Jurnal ini dibuat di Indonesia mengidentifikasi risiko terbesar terjadi adanya perubahan desain (Widianto & Huda, 2019).…”
Section: Metodeunclassified
“…39 (Taufik et al, 2018) x √ x x Jurnal ini dapat mengetahui faktor risiko yang dominan terjadi selama pelaksanaan proyek konstruksi gedung di Provinsi Aceh adalah faktor keuangan sebagai akibat keterlambatan pembayaran oleh owner. 40 (Widianto & Huda, 2019) x √ x x…”
Section: √ X Xunclassified