2014
DOI: 10.3997/2214-4609.20142329
|View full text |Cite
|
Sign up to set email alerts
|

Fast Automatic Method for Structural Interpretation of Logging-While-Drilling Images Acquired in Horizontal Wells

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The last one is drill more wells in the same area. The well can be side-tracked to reach additional payzones (Qleibo et al, 2014).…”
Section: Fig 1 Lwd Log Servicesmentioning
confidence: 99%
See 1 more Smart Citation
“…The last one is drill more wells in the same area. The well can be side-tracked to reach additional payzones (Qleibo et al, 2014).…”
Section: Fig 1 Lwd Log Servicesmentioning
confidence: 99%
“…This decision is affected by whether or not the tool failed in the current run. Also, if the client has requested a different combination of tools for the next run, then the same tools may or may not be used (Qleibo et al, 2014). If the field engineer needs to add or change LWD tools, the tools should be tested and prepared for the next bit run at this time.…”
Section: Tripping Outmentioning
confidence: 99%