2002
DOI: 10.1109/mper.2002.4311838
|View full text |Cite
|
Sign up to set email alerts
|

Fast Evolutionary Progranuning Techniques for Short-Term Hydrothermal Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2009
2009
2016
2016

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…The result, i.e., the optimal cost obtained by the proposed IPSO is compared with those obtained from DP, NLP, IFEP and DE in Table 6 for case 3. From Table 6 it is observed that the minimum cost found to be 925978.84 ($) by the proposed IPSO method and 928236.94 ($) by the DE method as compared to the previous minimum cost reported in the literature obtained by IFEP method [11], i.e., 933949.25 ($). Similarly, the execution time needed for getting optimal solution are 31.11, 36.82 and 203.02 s by the proposed IPSO, DE and IFEP methods, respectively.…”
Section: Methodsmentioning
confidence: 63%
See 3 more Smart Citations
“…The result, i.e., the optimal cost obtained by the proposed IPSO is compared with those obtained from DP, NLP, IFEP and DE in Table 6 for case 3. From Table 6 it is observed that the minimum cost found to be 925978.84 ($) by the proposed IPSO method and 928236.94 ($) by the DE method as compared to the previous minimum cost reported in the literature obtained by IFEP method [11], i.e., 933949.25 ($). Similarly, the execution time needed for getting optimal solution are 31.11, 36.82 and 203.02 s by the proposed IPSO, DE and IFEP methods, respectively.…”
Section: Methodsmentioning
confidence: 63%
“…The improved fast evolutionary programming (IFEP) method as described in Ref. [11] was also implemented on same machine for comparison of computational efficiencies of proposed IPSO method along with DE and IFEP methods. …”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Test case I has four cascade hydro power plants (HPP) and one thermal power plant having convex fuel cost characteristics [6] [8], [37] [39],- [46]. The HPP has multi chain cascade flow network as shown in Fig.…”
Section: Description Of Test Casesmentioning
confidence: 99%