2020
DOI: 10.31033/ijemr.10.4.8
|View full text |Cite
|
Sign up to set email alerts
|

Feasibility Study of Construction Additional Production Lines on Jelly Drink Plant at PT XYZ

Abstract: Demand forecasting is the first step for production planning and control to fulfil market demand. In line with economic growth in Indonesia, number of jelly drink's sale PT XYZ also increasing especially in 2011-2013 period. Unfortunately, PT XYZ has an issue to fulfil its demand in eastern area, and increasing production is one of solution to solve it. This research aims to analyze market demand of jelly drink in eastern area for the next five years, select the optimal location in which plant production capac… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…By implementing three different line balancing technologies to improve the production line efficiency of the edging unit, a simulation verification platform for data interaction with the control system is proposed, which can verify the control system at low cost [17]. The purpose of this study is to analyze the market demand of jelly beverages in the eastern region in the next five years, select the best place to increase the factory capacity, and conduct a feasibility study on building additional production lines [18]. The literature introduces the replacement of rigid production line with flexible box [19]: production line balance analysis using genetic algorithm [20].…”
Section: Introductionmentioning
confidence: 99%
“…By implementing three different line balancing technologies to improve the production line efficiency of the edging unit, a simulation verification platform for data interaction with the control system is proposed, which can verify the control system at low cost [17]. The purpose of this study is to analyze the market demand of jelly beverages in the eastern region in the next five years, select the best place to increase the factory capacity, and conduct a feasibility study on building additional production lines [18]. The literature introduces the replacement of rigid production line with flexible box [19]: production line balance analysis using genetic algorithm [20].…”
Section: Introductionmentioning
confidence: 99%