2017
DOI: 10.1016/j.egypro.2017.03.014
|View full text |Cite
|
Sign up to set email alerts
|

First Stepping Stones of Alternative Refurbishment Modular System Leading to Zero Energy Buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…Requirements for heat loss of building envelope vary depending on the requirements for indoor climate and energy performance in the specific country, outdoor climate, availability of renewable energy, and building typology [44]. Furthermore, results show that simple thermal insulation of building insulation can ensure a 50% reduction of building heat consumption, while practical measurements have shown a significant increase of indoor air relative humidity and CO 2 concretion levels [45].…”
Section: Technical Aspectsmentioning
confidence: 99%
“…Requirements for heat loss of building envelope vary depending on the requirements for indoor climate and energy performance in the specific country, outdoor climate, availability of renewable energy, and building typology [44]. Furthermore, results show that simple thermal insulation of building insulation can ensure a 50% reduction of building heat consumption, while practical measurements have shown a significant increase of indoor air relative humidity and CO 2 concretion levels [45].…”
Section: Technical Aspectsmentioning
confidence: 99%
“…Going forward, MORE-CONNECT focused on significant improvement of pre-production and production process of the developed solutions to advance the overall production efficiency and reduce the production costs [18]. The main tools to achieve this goal include automated 3D scanning of buildings, fully digitalized pre-production process and IT-supported the creation of data describing the automated fabrication of the modules.…”
Section: Technical Aspectsmentioning
confidence: 99%
“…Industrialization will allow the integration of individual components and systems previously manufactured with high quality standards in controlled environments. This significantly increases the speed of construction, leading to a reduction in execution time [34] and construction costs [35]. According to several studies, the use of modular strategies in construction can achieve time savings of 30 to 50% and ultimately cost savings of 20 to 40% [36].…”
Section: Introductionmentioning
confidence: 99%
“…The passive impact of this system in the building was further analyzed by Garay et al [49], reaching a reduction of the heat loss coefficient in the range of 55%. In addition, Hejtmánek et al presented a deep renovation study consisting of prefabricated insulating panels, implementation new smart HVAC systems and use of renewable energy sources [34].…”
Section: Introductionmentioning
confidence: 99%