Middle East Oil, Gas and Geosciences Show 2023
DOI: 10.2118/213628-ms
|View full text |Cite
|
Sign up to set email alerts
|

First Successful 16 X 13.375-in. Casing-While-Drilling Operation in Kuwait Saves 27 Rig Days and Reduces Well Delivery Time

Abstract: Drilling the 16-in. section in Minagish field wells in western Kuwait is among the most challenging well sections. Challenges include drilling through severe loss conditions, destabilized shale, and deteriorating hole conditions. These conditions can result in hole collapse or lost in hole of the drill string that requires sidetracking. The objective of project presented in this paper was to develop an engineered solution to drill through the difficult zones, lessen nonproductive time, and reduce the total wel… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles