Forecasting technology insertion concurrent with design refresh planning for COTS-based electronic systems

Abstract: This paper describes a methodology for forecasting technology insertion concurrent with obsolescence driven design refresh planning. The optimized parameter is the life cycle cost of the system. The resulting analysis provides a design refresh schedule for the system (i.e., when to design refresh) and predicts the design refresh content for each of the scheduled design refreshes. Optimal design refresh content is determined using a hybrid analysis scheme that utilizes Monte Carlo methods to account for uncerta… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
12
0

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(12 citation statements)
references
References 4 publications
0
12
0
Order By: Relevance
“…Although the data about the expected production lifetimes of parts available during a system's design phase may be incomplete and/or uncertain, it will allow the forecast of obsolescence and subsequent development of strategic approaches that will reduce sustainment costs [4,22].…”
Section: Obsolescence Forecastingmentioning
confidence: 99%
See 2 more Smart Citations
“…Although the data about the expected production lifetimes of parts available during a system's design phase may be incomplete and/or uncertain, it will allow the forecast of obsolescence and subsequent development of strategic approaches that will reduce sustainment costs [4,22].…”
Section: Obsolescence Forecastingmentioning
confidence: 99%
“…This approach analyzes the BoM of a product and grades for each component the likelihood of becoming obsolete [4,22].…”
Section: Obsolescence Management Tools Comparisonmentioning
confidence: 99%
See 1 more Smart Citation
“… Strict requalification requirements, which lead to high redesign costs, [6]  Low production volumes, which lead to little or no control over the associated supply chain [4,6,7,8], and  Higher sustainment costs compared to original cost of the system [6].…”
Section: Introductionmentioning
confidence: 99%
“…6 shows the impact of weight assigned to "implementation time" goal on the rank order. The current weight is just under 0.2 and the rank order changes when weight on…”
mentioning
confidence: 99%