2014
DOI: 10.1109/mpe.2014.2301552
|View full text |Cite
|
Sign up to set email alerts
|

Forewarned Is Forearmed: An Automated System for Remedial Action Schemes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…The closed-loop-based control is too slow to eliminate transient instability after a serve disturbance [31]. As a result, the open loop control based on the SPS system, shown in Figure 1, is adopted [10]. The control strategies are predetermined considering possible operating scenarios and are saved in the control strategy tables.…”
Section: Formulation Of Rtsec Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…The closed-loop-based control is too slow to eliminate transient instability after a serve disturbance [31]. As a result, the open loop control based on the SPS system, shown in Figure 1, is adopted [10]. The control strategies are predetermined considering possible operating scenarios and are saved in the control strategy tables.…”
Section: Formulation Of Rtsec Problemmentioning
confidence: 99%
“…However, the wide-area measurement system-based closed-loop method [9], which is difficult to implement in practical projects, is hindered by communication signal delay. Transient stability emergency control is usually designed as an open-loop scheme to eliminate possible rotor instability by applying control measures that are stored in look-up tables beforehand, such as generator tripping and load shedding after severe disturbance [10].…”
Section: Introductionmentioning
confidence: 99%
“…1) Power reserve of an actual operating point: The available power reserve ∆P inj,res of a generator with respect to its maximum power injection can simply be computed from the difference between the current stability margin %∆P inj (8) and the pre-determined security margin m sec , since both are expressed as percentages ofP inj (7).…”
Section: F Computation Of Available Power Reservesmentioning
confidence: 99%
“…The system executes corrective actions such as load or generation reduction to ensure reliable and safe system operation after fault occurrence. The automatic system-wide RAS arming system currently used in the power grid of British Columbia was described in [7]. The RAS arming patterns are determined periodically employing a transient stability analysis tool, which ensures security of the system.…”
Section: Introductionmentioning
confidence: 99%