2011
DOI: 10.1007/s10749-011-0246-0
|View full text |Cite
|
Sign up to set email alerts
|

Formation of the stress-strain state of the dam at the Sayano-Shushenskaya HPP during 2010 filling of reservoir

Abstract: Translated from Gidrotekhnicheskoe Stroitel 'stvo, No. 4, April 2011, pp. 2 -6. Results of intentional action on the temperature field of the dam, which had been supercooled during the winter of 2009/10, to improve its stress-strain state by regulation of the reservoir-filling regime, are presented.The Sayano-Shushenskii hydroproject is situated on the Yenisei River. Its component parts include an arch-gravity dam with a height of 242 m, crest length (at elevation 542 m) of 1074 m, and width of 105 m along … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Monitoring the condition of such buildings and structures was provided by systems that were installed during construction. But over time, these systems partially failed [4] or became obsolete. This situation reduces the monitoring system reliability and may lead to delayed response during emergencies.…”
Section: Introductionmentioning
confidence: 99%
“…Monitoring the condition of such buildings and structures was provided by systems that were installed during construction. But over time, these systems partially failed [4] or became obsolete. This situation reduces the monitoring system reliability and may lead to delayed response during emergencies.…”
Section: Introductionmentioning
confidence: 99%